Waterfront Conference Centre
Overview:
Help create the new look of one of Belfast’s most iconic buildings. The project included work on the main elevation façade, installing mirror soffit cassettes for insulation and installing architectural wall panels on other parts of the building. All flashings and capping were manufactured by us at our premises. The project was delivered as per the client’s brief, on time and within budget.
Materials Used:
Brett Martin- Marlon click-fix polycarbonates, Kingspan Benchmark soffit cassettes and Kingspan wall panels.
Contract Duration:
1 year
Contract Value:
circa £1.4m